Veldacademie

  • Nl
  • En
  • What we do
  • Find a project
  • For students
  • Meet the team
  • Up to date
Project

Redevelopment RET-depot

share this page

Project type:
Contract
Status:
In progress
Period:
March 2012
Clients:
Stadshavens
Partners:
Jef van den Putte
Location(s):
Oud-Charlois
Subjects:
Vacancy, Redevelopment, Creative economy

The depot as a district-power-plant, cost and scenarios and quickscan Building Regulations

On behalf of Stadshavens, additional research was performed to study the opportunities of the former RET depot on Sluisjesdijk in Oud Charlois. To bring the re-commissioning of the ‘iconic’ building a step closer, more knowledge is needed on the structural conditions of the property, on the necessary interventions and on the financial consequences.
In 2009, Field academy made extensive surveys of the property which, in addition to the recently publishd Projectplan Wijkgebonden Energiebedrijf (Project Plan Area Bound Energy Company), forms the basis for an in-depth exploration. In collaboration with JefvandenPutte Architecten, a number of global development scenarios were set, which were tested to Decree and regulations regarding fire safety and escape routes.

The former RET depot on Sluisjesdijk in Old Charlois is regarded as a an economic focal point in the Nationaal Programma Kwaliteitssprong Zuid. Recently, Stadhavens investigated which parties can contribute to the interpretation of this and what can be considered the connecting theme. The advisor described the creation of ‘a neighbourhood bound energy company’, with the aim of making the existing housing stock in the neighbourhood more sustainable overall in energy. Besides housing insulation, one may think of for instance encouraging the use of alternative energy sources, such as waste heat from the port area. The starting point is the realization of a partnership between the parties involved in vocational education, residents’ participation, employment, private housing and climate adaptation.

Downloads
Author(s) Date Type Size
RET rapport veldacademieRET rapport veldacademie Sander Smoes, Otto Trienekens March 2012 pdf 3.41 MB

See also

  • News

    Redesign RET Remise

  • News

    Progress conversion RET Remise Sluisjesdijk

  • News

    RET Depot as economic focus

  • News

    Redevelopment RET-building progressing

  • News

    Creatief Beheer starts activities in the RET-building

  • News

    Talent in development at RET depot

  • News

    MBO-students at work in the former RET bus depot

  • News

    Perception of safety of Sluisjesdijk

  • News

    RET location as an study- construction site

  • News

    1st SOFIE-loan granted to Stichting Handelscompagnie Sluisjesdijk

  • News

    Advice 'social return' for Havenbedrijf completed

  • News

    Requested: Intern Energy-lab business pier Sluisjesdijk

  • News

    Geslaagd festival op de Sluisjesdijkpier

  • Geslaagd festival op de Sluisjesdijkpier

    Contract

  • (Re-)activation via transformation

    Master thesis

    TU Delft
    Architecture

  • Merging Maximiliaanstraat

    Contract

    Together is more fun than just alone

  • Design Strategies Problem Areas

    Education

    Minor Social Sustainability 2009

  • Interested in our e-mail updates? Click here.
  • Privacy statement
↓